New York, NY 10038 Enter all persons authorized to obtain permits for the applicant, their affiliation to the applicant and their telephone number and email address. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. The Permit Bureau issues a number of different categories of construction-related permits for work on a street. 80-30 Park Lane NYCityMap is the city's web-based interactive mapping application. (10.5mb), CTDOT_Traffic_STD_DGN.zip HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. WORK 10AM-3PM TO SET UP WORK AREA INCLUDES SHIFTING MOVING LANE TO CENTER STRIPED AREA AND ESTABLISING WORK ZONE ONCE WORK ZONE ESTABLISHED MAY WORK 24/7 WITHIN WORK ZONE/DRILLING ALL WORK IN ACCORDANCE WITH DRAWING MPT-3 8/28/07. http://mutcd.fhwa.dot.gov back to top N New York 811, Inc. The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. Fax: (718) 699-7491 For street operations, a crane permit is required for all cranes and derricks operating in the street with a maximum rated capacity greater than 20 tons and which are not related to building operations. OFFICE. MUST MAINTAIN 1 SOUTHBOUND AND 2 NORTH BOUND LANES AFTER ESTABLISHED WORK ZONE IS SET UP. The applicant may be required to address the circumstances of a hold before a permit is released. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. SPECIAL PROCEDURES TO FOLLOW WHEN RESTORING TRENCHES IN RECENTLY PROTECTED RECONSTRUCTED ROADWAYS: 1. New York, NY 10007
645 Signs - New York State Department Of Transportation At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. For Holds: (718) 222-7231 Clicking on the "i" button at the top center of the map will change the cursor into an arrow with an "i" next to it. A sketch showing the canopy dimensions, location and all street facilities and furniture within 15 feet of both sides of the proposed canopy. Long Island City, NY 11101 THIS STIP IS USED FOR WORK IN NUMEROUS LANES AND THROUGHOUT THE LENGTH OF A BLOCK. COORD. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. 3. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City 1932 Arthur Avenue, 5th Floor It seems that JavaScript is not working in your browser. MOVEMENT RESTRICTIONS ALONG EXTERIOR STREET WILL BE IN EFFECT DURING ALL SPECIAL EMBARGOS AFFECTING THE AREA SUCH AS THE POPE VISIT AND ALL STAR GAME. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. Advance notice and coordination of planned street work is one of the most effective tools for reducing the number of street excavations, especially on streets that are scheduled to be resurfaced or reconstructed. 30-30 Thomson Avenue, 4th Floor NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. MAINTAIN A 5-FOOT CLEAR SIDEWALK WHEN WORKING ON THE ROADWAY AND A 5-FOOT PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY MEETING NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY WHEN WORKING ON THE SIDEWALK. ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE.
DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America.
If a contractor is being used, the contractor must be registered with NYC DOT and must take out the permit. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F. ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. Bureau of Permit Management and Construction Control Download about 619 . ALL WORK SHALL ALSO BE COORDINATED WITH ALL OTHER ONGOING CONSTRUCTION IN THE AREA. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. The applicant will also be notified of any corrective action necessary and recourses available. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which summonses/NOVs may be issued.). DURING RESTORATION SAW CUTTING IS REQUIRED AS PER DRAWING H-1042A, THE PERMITTEE IS NOT PERMITTED TO ENTER, OCCUPY OR USE ANY PUBLICLY-OWNED OR PRIVATELY OWNED, NON-PAVED, LANDSCAPED OR NON-LANDSCAPED LOCATION WITHOUT SPECIFIC WRITTEN PERMISSION. 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). Designers and contractors should refer to the specifications listed below with special attention to the Construction & Material Specifications; Highway Lighting, Traffic Control, and Intelligent Transportation . Tel: 718-286-3170 the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Revenue hold If the permittee owes NYC DOT money for an open Corrective Action Request (CAR) or Jolt Elimination Team (JET) bill, all future permit requests may be placed on hold until the bills are paid. Permit Bonds, as described in the Highway Rules, Section 2-02 (a) (4), should cover all permitted activities. All addresses must be the same on all above referenced documents. THIS PERMIT INCLUDES ALL WORK ASSOCIATED WITH THE INSTALLATION OF TREE PITS/STORM WATER CATCHMENTS. New York, New York 10041. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Outlined below are the basic application procedures for Street Opening Permits. Weekly Milling and Resurfacing and Concrete Repair SchedulesNYC DOT weekly milling and resurfacing schedules are available online. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. FULL TRAVEL LANE RESTORATION WOULD BE REQUIRED FOR 11' WIDTH OF TRAVEL LANE AND THE LENGTH OF THE WORK PLUS ANY LL14 CUTBACKS.