Yoshihiko Okada, senior managing director, pointed out problems in their stake - out jobs, "So far, we have been using manual total stations for the stake - out portion of the work. Press Enter. During the Queen Street closure, westbound 501 Queen streetcars would divert via Church, Richmond and York Streets while eastbound streetcars would divert via York, Adelaide and Church Streets. Stake out using Total station 11,298 views Jul 7, 2017 72 Dislike Share Save ajay goud 65 subscribers It includes method of finding the location of coordinate point in the field using stake. Safer, smarter, and more efficient mining. This manual contains important safety directions as well as instructions for setting up the product and operating it. There are less than a dozen producers of total stations that generally market in the United States. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. TcpET Surveying and Setting Out using Total Station Traversing using Total Station 10. That is, the exact length, width, depth, and position of the foundation trenches must be marked on the ground. Total Stations Weebly This manual contains important safety directions (refer to section Safety directions) as well as instructions Riders can also transfer to the 509 and 511 streetcars at Exhibition Loop. Parts of a total station. It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM).. ATheodolite is a instrument for measuring both horizontal and vertical angles, as used in triangulation networks. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. Once the area has been mapped out, you can use the total station to perform a task called a stake out. Pedestrian access would also be provided. History of construction surveying. Slope distances were measured electronically, and also the instruments could, generally, be used to reduce the values to verticaland horizontal components. [9] By the end of August 2022, buildings at the site of the future Corktown station had been demolished to allow for construction to start in 2023. Escalators, elevators and interior corridors will be available to facilitate transfers. Once the site is prepared, a tunnel-boring machine will launch north and west from the site while another launches south and east towards the Don Yard. [24], In July 2019, the Toronto Star obtained and reported on confidential documents from Metrolinx. A basic total station survey package (including tripod and prism pole) will cost about $7,500 and reflectorless or robotic units can cost upwards of $20,000. The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. Follow the LinkedIn page LinkedIn: https://www.linkedin.com/company/sitenghttps://www.linkedin.com/in/greg-stepien-7346ab183Subscribe: https://www.youtube.com/c/SITENG?sub_confirmation=1 EVERY GOOD CIVIL SITE ENGINEER MUST HAVE - watch the VID https://youtu.be/4X-nwn-J-wo - items I use and recommend SAFETY BOOTS-choose your size https://amzn.to/3NfjUCJ https://www.screwfix.com/p/dewalt-phoenix-safety-boots-tan-size-9/7001vTAPE MEASURE https://amzn.to/3xQ3cEf https://amzn.to/3xZ9ykMTAPE HOLDER https://amzn.to/3NzLDOV https://ffx.co.uk/product/Get/Makita-E-05278-088381566780-Tape-Measure-Holder CALCULATOR - sometimes you can find them half price in Supermarkets https://amzn.to/3u2hHE6DRAWING FOLDER https://amzn.to/3NqYoeA https://amzn.to/39OUNZP NOTEBOOK - get whatever really to take some notes https://amzn.to/3HQkbLxPENCIL - 0.7mm - good price, but for this colour https://amzn.to/3OlvwW3PENCIL - 2mm https://amzn.to/3QHVIffJOINER'S PENCIL https://amzn.to/3xRIaFlTIPP-EX - these are the best I used https://amzn.to/3QNrKGHPERMANENT MARKERS https://amzn.to/3ykpcZvCHALK LINE https://amzn.to/3A0aUOYFEW EXTRAS I USE TOO SMALL SPIRIT LEVEL - you can always borrow from a Chippie if needed https://amzn.to/3OEXs79KNIFE https://amzn.to/3HQKUrl GLASSES - Despite you will get safety glasses, on some sites theyre really low quality and I dont want to get my sight worse using them. https://youtube.com/watch?v=ONZds9ratAE https://youtube.com/watch?v=C78SuqmLPDE Focus on the prism using the large focusing knob as necessary. The station will have three levels, with the Line 5 platforms below street level, the bus terminal at street level and the Ontario Line platforms above street level. [10], The line will have 15 stations, with four connecting to other Toronto subway and light rail lines and two stations connecting to GO Transit rail services. Pocket 3D: Creating Polyline from points. Professionalism is something sometimes overlooked, but NOT with these guys. Chris Waller began writing in 2004. MAGNET Field: Backsight Set Up using 2 known points with Total Station . A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300 The Trimble S Series DR 300 is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources Connections to the 504 King and 511 Bathurst streetcars will be available on the surface. Li-ion S Li-ion This is the mark of the Japan Surveying Instruments Manufacturers Association. This will allow you to see your current position's station and offset on an alignment, relative to a referenced road. But Ford himself is cause for skepticism", "Ontario unveils $28.5-billion transit plan, vows to double length of Toronto's downtown relief line", "Ford transit plan like 'Groundhog Day' for waterfront: Coun. In motorised stations, the software will automatically direct the device to the desired location. Project > Compute . Mostsurvey instrumentsscrew onto a tripod when inuse. Parts of the SET Total StationParts of the SET Total Station 3. All the equipment used Category:
To fully understand the use of surveying instruments, take a course from a licensed surveyor. Schlouch Incorporated's use of Trimble Robotic Total Stations, Trimble GPS (Global Positioning System) and GPS equipped field machines ensures . They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. Ranges with standard prisms and reflectorless version differ widely between manufacturers. eames replica lounge chair review. Ltd. All Rights Reserved. Its also mandatory that at least two people be on the crew. Steph, Ben, and the team worked hard and were there for us every step of the way; whether it be diagnosing problems in the office, waiting on hold with tech support, emails, calls, etc. Use the locking knobs on the side of the theodolite to keep it aimed on the point. Their importance in the last few years is seen to be steadily increasing. user can also automatically turn the total station to the point if using a robotic instrument by pressing the Green arrow. According to Metrolinx, the new line will do more than provide relief to overcrowding on Toronto's existing subway system: it will provide new connections to the communities of Flemingdon Park and Thorncliffe Park. SET1X SET2X SET3X SET5X Total Station Class 3R Laser Product SURVEYING INSTRUMENTS OPERATORS MANUAL Thank you for selecting the SET1X/2X/3X/5X. In this video we demonstrate how to stake to a reference alignment. Metrolinx expects the Ontario Line connection at Pape station will reduce rush-hour congestion at BloorYonge station by 22 percent. STEPS. Step 3. Total stations are installed over control points similarly to traditional transits, theodolites, or EDM. Revision Solve surface and UG challenges with proven technologies for planning, operations, and safety. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. The northeastern terminus of the Ontario Line would be Science Centre station at Don Mills Road and Eglinton Avenue. The line would then enter Gerrard station on an elevated structure over the intersection of Gerrard Street and Carlaw Avenue. A total station is a device that you can use to plot out an area of land before you begin construction. Tip. If the coordinates are incorrect, press the "No" button to try again. Step 1: Gather the Survey Equipment, Stake, and Tools. Teaches total station from scratch. The SET2 is a tacheometer, a device that can rapidly measure Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300+ The Trimble S Series DR 300+ is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources In conjunction with ATC, stations will have platform-edge doors for safety, also allowing riders to exit and enter trains more quickly. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Control points established by resection methods are adjusted for horizontal position by least squares before they are used in the field. The provincial government claimed that the higher estimate was due to inflation and supply issues. Electronical Total Station Congratulations on your purchase of a new Leica Geosystems Total Station. Chris earned Bachelor of Arts degrees in journalism and English from Truman State University. Get the necessary materials ready (i.e. [7][6] A groundbreaking ceremony for the project took place on March 27, 2022. A total station can measure angles and distances electronically and process trigonometrically to give us, at a minimum, position coordinates in space. [28], In October 2019, Tory and Ford reached a tentative deal in which the city would endorse the line and the TTC's subway network would not be taken over by the provincial government. 8. Data transfer and conversion. Find out What is a Total Station? A 30X optical zoom is not uncommon on many total stations. This station would be a transfer point for Line 5 Eglinton and TTC buses. [52] The government also claims the alternate technology will reduce construction time and cost, as single tunnels rather than dual tunnels could be utilized. Leica UK Quick Guides Surveying, Setting-Out on your TPS 800 Series Total Station Most of this guide will be relevant for the TPS300, 400 and 700 series also but some functions may vary slightly. Metrolinx prepared the plan for the Ontario Line in just three months based on a proposal by transit consultant Michael Schabas. [ citation needed ] Profession [ edit ] South of Gerrard station, the Ontario Line would run along the northwest side of GO Transit's Lakeshore East rail corridor located on an embankment. Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. Their added functionality makes them suitable for intense mapping. If not you will need to return to the main menu and select the Tap Here to choose Design Data to the far left of the job carousel. [9] Upon opening, the plan is for the line to assume the "Line 3" moniker currently used by Line 3 Scarborough, which is expected to close in 2023. The nearly perfect squareness and north-south orientation of the Great Pyramid of Giza, built c. 2700 BC, affirm the Egyptians' command of surveying. Then the centre lines of the rooms are set out by setting perpendiculars in the ratio 3:4:5. This discussion provides general guidance on the use of total stations on topographic surveys. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. Issues on speed and cost of their works. The staked out points were marked using the taping pins. application of binomial distribution in civil engineering 5. Whether you use total stations or software with these brands, the TinySurveyor will offer its full range of features. These will be used to store trains and to provide for future northward expansion. Stable data communication with long-range Bluetooth (up to 400m) ATRplus technology, maximising the total station's ability to remain locked on your target for highest point-to-point layout speed. How to use a total station for setting out pdf Operating costs for the above-ground sections may be higher due to exposure to the elements. The Leica TPS1100 Professional Series was designed to provide practical solutions to make surveying processes simple, efficient and productive. pane displays. A field laptop computer will run $2,000 to $3,000. Trigonometric Leveling - Heights and distance problem (Two Exercises) 4. fintroduction total station is a combination "Tune out targets" feature to ignore other distractions in the field. That is, the exact length, width, depth, and position of the foundation trenches must be marked on the ground. The section between Queen/Sherbourne and Gerrard stations would come to the surface and mostly follow a railway right-of-way instead of being tunnelled. Stake offsets This command will stake out up to two user-defined horizontal offsets to a centerline at any station, as well as an unlimited number of offsets per station, if you are using a predefined Cutsheet Station and Offset List (loaded using the Settings button). Automated construction layout tool to speed-up jobsite stake-out using digital methods and BIM $15,739.00 Compare PLT 400-2 Construction layout tool New Versatile and easy-to-use construction layout tool for one-person operation, with 2" angle measurement accuracy and extended range for faster stake out of positions on the jobsite From $26,399.99 Get Traffic & Exposure. Controlling Vertical Towers w3.leica-geosystems.com The Ontario Line would cross the Don River on a new bridge located on the north side of the existing rail bridge. [50], In 2019, Metrolinx was considering a means to link Exhibition station to Ontario Place to the south. This turns 4Site Survey into an advanced mouse or digitiser Servo Driven and Robotic Total Station-, What Is Transit Theodolite | Theodolite Parts, Principle of Plane Table Surveying Methods |Equipment | Error | Advantage | Limitation, Piling for Foundation | Use of Pile Foundation | Characteristics of Pile Foundation, Test for Compressive Strength of Brick | Water Absorption | Dimensions Test, What Is Traversing in Surveying | Types | Method | Definition, What is Chain Surveying (Principal, Procedure, Method, Instrument), First Angle Projection & Third Angle Projection Symbol (Orthographic Projection), Introduction of Gantry Girder | Load on Gantry Gutter | Types of Load on Gantry Gutter, What Is Dry Pack Mortar | Advantages of Dry Pack Mortar | Disadvantages of Dry Pack Mortar, What Is Unit Weight | What Is Density | What Is Unit Weight Material | Unit Weight Building Materials, What Is Pier Foundation | Types of Drilled Piers | Advantages and Disadvantages of Drilled Pier Foundations, What Is Diversion of Headworks (Rivers) | Types of Diversion Headworks | Component Parts of Diversion Headworks (Rivers), https://www.skippertech.com/total-station/, What Does Parapet Mean | Types of Parapet Wall | Uses of Parapet Wall, What Is a Flight of Stairs | Types of Stairs | How Many Stairs in a Flight | Some Facts About Stairwells, Cinder Block Vs Concrete Block | What Is Cinder Blocks | What Is Concrete Blocks, What Is Shoring In Construction | Type of Shoring, Floating Slab Vs Monolithic Slab | What Is Monolithic Slab | What Is Floating Slab, H-Beam vs I-Beam | What Is H-Beam | What Is I-Beam. Set within a 20-minute walking distance from Rogers Centre, the hostel gives quick access to a bus stop in Downtown Toronto district. [71] The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. In motorised stations, the software will automatically direct the device to the desired location. [68] On February 4, Metrolinx began work to remove eleven trees on the Osgoode Hall site but had to pause work due to court injunctions, one filed by the Law Society of Ontario and later another by the Haudenosaunee Development Institute, an Indigenous organization. How to set out coordinate points using Leica TC407 VidioHD Atotal stationis an optical instrument used in modern surveying. The SET2 is a tacheometer, a device that can rapidly measure If the specified slab elevation is above or below the reference point, figure out by how much and determine where that point should be in relation to the level plane. Using Real Time Kinematic (RTK) for construction staking is effective, and allows for real-time information and positioning so that the surveys and stake placement can be as accurate as conventional land surveying and done in less time. In the next screen, use the keypad to enter the coordinates or distances and press the "OK" button to measure. Use the polyline to create points along that line (usually every 20-25m but depends on what you're laying out). 2 Guide to using this document There are a variety of tasks that can be performed with a Total Station. Record angle and distance observations in the field. . The accuracies of measurements with the less expensive instruments probably run about 6(5 mm 1 5 ppm), and the expensive total stations can run about 6(1 mm 1 1 ppm). Options to provide the link included a people mover or cable cars. SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. [5] Originally, the cost was estimated at $10.9billion with completion by 2027. [36], In July 2019, the estimated completion date was 2027. Only one entrance is planned, and plans for an emergency exit are not yet known. Fig.1: Example plan to be set out on the ground. By November 2022, that estimate had nearly doubled to $17 to $19 billion. Otherwise, the EDM part of this instrument will be damaged. Press CONT by using the F1 key. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Prism Pole, For Surveying, Total Station, Sokkia, Topkon, Trimble, Leica 2.6 meter; Leica charger GKL341 original for all battery; Archives. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. The program The instrument is costly, and also for conducting surveys with a total station, skilled personnel is necessary. Reflectorless accuracies arent as good as prism accuracies given this variability of the reflecting terrain, and can, therefore, might not be suitable for more accurate surveys like FEMA first floor elevation certifications. In the outer range limitations, bicycle reflector tape (. This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3) due diligence of interactive media; and (4) dissemination of interactive media. Otherwise, then the retro-reflector offset correction has to be determined and implemented to found spaces. It may be challenging to fit the Ontario Line along GO Transit's. See More. The results will be displayed on the following screen. Step 4. An entire station is a combination of a digital theodolite, an electronic distance measuring device (EDM) and a microprocessor with a memory unit. We are committed to being everywhere our customers need us to be and authorized resellers, such as NSS Canada, are invaluable in helping us to fulfill that commitment. PLT 300 layout tool. A total station is an optical surveying instrument that uses electronics to calculate angles and distances. Working with Northern Survey Supply makes this organization safer and more efficient. Exactly how you setup and configure the system depends on the task. STN for station points, CB for corner Consequently, Union Station is Via Rail's busiest and most visited station by far. The elevated Ontario Line station will be along Don Mills Road at the northeast corner of its intersection with Eglinton Avenue. [44], The Government of Ontario plans to use smaller train sets and a smaller gauge for the Ontario Line than those used on the Toronto subway system. What is Setting Out/Stake out? Trimble Trimble S Series Total Station User Guide v Important Information 1 Laser Safety Before using the instrument, make sure that you understand this user guide, as well as all When classical terrestrial surveying methods are used in staking out of highway construction projects one can meet with some difficulties such . Determine of area using Total Station 9. Ideal for graduates and trainees. View on map 900 yd from City Center 800 yd from Union Station. Sometimes, vendors will offer to come to the district and exhibit their own equipment on your local operating environment, Total station surveys are conducted similarly to transit stadia or. Pocket 3D: Creating Polyline from points. Discussions with users at other engineers and surveyors, local survey suppliers, and AE survey builders are will also be recommended. Extract and relate coordinate information from drawings. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Dan berikut fitur-fitur standar Electronic Total Station untuk pekerjaan stake out yaitu ; Stake out berdasarkan HA-HD, yaitu stake out berdasarkan pada besaran sudut horizontal dan jarak datar Stake out berdasarkan koordinat (X, Y, Z), yaitu menentukan posisi suatu titik dilapangan berdasrkan data koordinat. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. ; In the sixth century BC geometric based techniques were used to . We have also tried to give a little brief about the Total Station. When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. Step 3: Set-up the Tripod. 24.31 Assume that a 100-ft entry spiral will be used with the curve of Problem 24.7 9. ; A recent reassessment of Stonehenge (c.2500 BC) suggests that the monument was set out by prehistoric surveyors using peg and rope geometry. Point number (you may want to use different point-numbers for the station points and topo points) Target height (for prism pole shots measure from the ground to the centre of the prism Code (depending on what your software does with it, e.g. 1 How to Set Up Builder to Gain a Known Station 16 1.1 Set Up Anywhere Based on Given Control Line 16 1.2 Set Up over Control Line 18 1.3 Set Up Anywhere with Given Coordinates 20 1.4 Set Up over One Known Point with Second Known Point 24 1.5 Set Up Using Nails from Profile Boards 28. [5], In 2019, the estimated cost of the line was to be about $10.9 billion. It was estimated that the Relief Line South would cost around $6.8billion[16] and open in the late 2020s. SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. Operating the Ontario Line along an elevated Lakeshore East embankment might require slower speeds in order to navigate grades and curves. 2.Initially, an AB line was performed with three different speeds, i.e. June 3, 2022 . There will be a substation at 153 Dufferin Street, opposite Dufferin Gate Loop. The total station was then being set up at different location and steps 2 through 7 were repeated. The Total station is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tachometric surveys, as well as for solution of application geodetic tasks. [11], Efforts to increase capacity on Line 1 included longer, walk through trains, as well as the transition to automatic train control to increase the frequency of service. Introduction. How To Stake Our Points Staking out points is one of the most common uses for a total station. Make sure that the total station is level and on secure, even ground before continuing. Mining Solutions. Utilizing the telescope tangent screw and the tangent screw, center the eyepiece lens vertically and horizontally on the prism with the cross hairs centered on the prism. A total station would set out using co-ordinates and Electromagnetic Distance Measurement (EDM) whilst the theodolite would find the bearing then the distance would be measured with a tape.